It looks like you're using an Ad Blocker.
Please white-list or disable AboveTopSecret.com in your ad-blocking tool.
Thank you.
Some features of ATS will be disabled while you continue to use an ad-blocker.
Originally posted by coolottie
so you should be a positive example and be nice to little old ladies.
Originally posted by coolottie
Here is all the info on all of the CoE and the floodgates just finished, that I guess we don't need anymore since they are blowing up all the levees.
The project is designed to reduce the risk of flooding caused by a storm surge that has a 1% chance of occurring each year.
The existing Plan of Operation for the Floodway was reviewed by Missouri state officials in November 1985 and approved by the President, MRC, in January 1986. The plan required modification to the frontline levee which includes raising 12,500 feet of the upper fuseplug and 7,500 feet of the lower fuseplug and installing horizontal polyethylene pipe in three crevasse locations. These crevasse locations are designated as Inflow, Inflow/Outflow No. 1 and Inflow/Outflow No. 2. In addition to the modifications to the frontline levee, all materials, including the blasting agent which will be pumped into the pipes in the levee, and equipment necessary to place the floodway into operation have been acquired by the Memphis District.