It looks like you're using an Ad Blocker.
Please white-list or disable AboveTopSecret.com in your ad-blocking tool.
Thank you.
Some features of ATS will be disabled while you continue to use an ad-blocker.
Quote from source:This video surfaced today on NASA Watch, but there's not a lot of details about Project M. According to the America Space website, Project M is a program being developed out of the Johnson Space Center Engineering Directorate to put a lander on the moon with a robot. Supposedly, the mission could be done within a 1,000 days once the project got the go-ahead.
It would be different than other NASA projects in that there would be no prime contractors, but just using "the best engineers in the world to get the job done on time," said America Space.
Cryptically, the website also says the project has been “go” since Monday, November 9th, 2009.
Originally posted by predator0187
www.universetoday.com...
Quote from source:This video surfaced today on NASA Watch, but there's not a lot of details about Project M. According to the America Space website, Project M is a program being developed out of the Johnson Space Center Engineering Directorate to put a lander on the moon with a robot. Supposedly, the mission could be done within a 1,000 days once the project got the go-ahead.
It would be different than other NASA projects in that there would be no prime contractors, but just using "the best engineers in the world to get the job done on time," said America Space.
Cryptically, the website also says the project has been “go” since Monday, November 9th, 2009.
I personally think this is a good idea rather than sending humans. It would be a step in the right direction.
Any thoughts?
Pred...