It looks like you're using an Ad Blocker.
Please white-list or disable AboveTopSecret.com in your ad-blocking tool.
Thank you.
Some features of ATS will be disabled while you continue to use an ad-blocker.
" I have worked in the government on and off for 40 years. During that time I became quite familiar with requisitions, bidding, awarding contracts etc. It is a time consuming process with bean-counters and pencil-necked bureaucrats every of the way. The simplest request takes months not days or hours.
In less than 8 hours of the shutdown, miraculously, professionally printed 3X4 foot signs appeared all over the country in the tens of thousands saying-“this [park, facility, etc. with custom logos] closed due to government shutdown. There has not been a government shutdown in 17 years.
These signs were designed, specifications were determined, signs were then requisitioned, bids were posted and vetted, government contracts were awarded. The materials were then ordered and the signs manufactured then distributed U.S. Mails or .
This shutdown was orchestrated and planned well in advance at least 6-8 months ago. Millions of tax dollars were appropriated and spent in this process. There is a paper trail a mile long leading directly to the White House."
Do these Signs point too the Pre Planned Shutdown?
mikegrouchy
links234
When the govrenment almost shutdown last spring it was almost a given. "Be prepared to shutdown tomorrow," was what filled email inboxes for a week before the date. Then, once every government organization had fully prepared to shutdown, the pol's agreed to keep the government open.
I wouldn't be suprised if these signs are from last spring. Honestly, I didn't think the government would shutdown this time.
Asktheanimals
mikegrouchy
When did they install a metal fence completely around the Lincoln monument?
There was never one last time I was there in '07
That must have cost a fortune!
Conservatives should not approve a CR unless it defunds Obamacare.