www.japantimes.co.jp...
Saturday, June 25, 2011 Tsuruga Fukui Pref. — A device that fell last August into the vessel of the Monju prototype fast-breeder reactor in Tsuruga, Fukui Prefecture, was finally retrieved Friday, paving the way for resumed test runs by fall, the Japan Atomic Energy Agency said. But due to the nuclear disaster at the Fukushima No. 1 power plant, triggered by the March earthquake and tsunami, it is unclear whether the country's nuclear fuel recycling project, in which the troubled Monju prototype would play a key role, can move ahead as planned. Because it is meant to produce plutonium, were it to experience a leak accident, the danger would be grave.
The agency hopes to resume test runs of the reactor at 40 percent of its output capacity by the end of March, aiming for full operation by the end of March 2014.
Originally posted by arufon
the Japanese have obviously learned NOTHING.