Halliburton give testimony to U.S. Senate about their role in the Gulf oil spill

page: 1
2

log in

join
share:

posted on May, 12 2010 @ 05:24 AM
link   
It's 3 am - I just happened across this and wanted to get it on board.

With the absolute MEDIA BLACKOUT of Halliburton being connected with the Gulf oil spill I was beginning to wonder if it was conspiracists keeping it alive without real proof. This document says a bit what was going as well as a lot of "legaleze" and blaming.

So, here it is:

Halliburton Address to U.S. Senate 11May2010

I'll add quotes tomorrow if it hasn't been covered but here's a small bit; cool schematic too which shows just how DEEP this thing is drilling!



Approximately 20 hours prior to the catastrophic loss of well control, Halliburton had completed the cementing of the ninth and final production casing string in accordance with the well program. Following the placement of 51 barrels of cement slurry, the casing seal assembly was set in the casing hanger. In accordance with accepted industry practice, as required by MMS and as directed by the well owner, a positive pressure test was then conducted to demonstrate the integrity of the production casing string. The results of the positive test were reviewed by the well owner and the decision was made to proceed with the well program. The next step included the performance of a “negative” pressure test, which tests the integrity of the casing seal assembly and is conducted by the drilling contractor at the direction of the well owner and in accordance with MMS requirements. We understand that Halliburton was instructed to record drill pipe pressure during this test until Halliburton’s cementing personnel were advised by the drilling contractor that the negative pressure test had been completed, and were placed on standby.




[edit on 12-5-2010 by Thermo Klein]



posted on May, 12 2010 @ 05:41 AM
link   
Here's a second story from Huffington Post

Give details of events before the explosion

Also note: Deepwater Horizon is apparently also named "Mississippi Canyon 252 Well"

A View From Inside BP: "Hubris" Before the Blowout



Here's where this account varies from others I've heard. Apparently, after hanging off the casing, cementing, setting the packoff, and testing, they came out of the hole with drillpipe, then went back with a bridge plug to set in the top of the casing to seal the inside. A bridge plug is a mechanical device, in this case run on drillpipe, that is set with weight from the drill string after it is turned to activate it. With two plugs in the casing, and the packoff outside the casing, the well should have been safe.



In a strange twist of fate, the off-shift crew was reportedly having a party in the living quarters, celebrating 7 years of accident free performance. Dear God. This writer confirms that there were 7 BP bigwigs visiting on the rig at the time, which we've now heard from several sources.



[edit on 12-5-2010 by Thermo Klein]



new topics
 
2

log in

join