It looks like you're using an Ad Blocker.
Please white-list or disable AboveTopSecret.com in your ad-blocking tool.
Thank you.
Some features of ATS will be disabled while you continue to use an ad-blocker.
Originally posted by Boockelbee
The JSF is a massive rip off, theyve been developing this airplane since 1999 and it is ready in 2013, cost are rising and rising.And for what, an airplane that is mediocre at best at that time.
Now that is VERY interesting news waynos. I had been hoping that the RN/FAA would come to it's senses. I had not heard that there was any recent plan to fit the QE class with catapult gear. Last I heard was that they would go with the inferior ski jump F-35B option. When was this announced?
Originally posted by waynos
In addition the F-35C Lightning is back in the running instead of the STOVL version due its superior payload/range performance and greater variety of weapons its bay can accomodate, as well as the fact that the F-35C unit price is likely to be considerably lower than that of the F-35B, more commonly known as 'more bang for buck'.
HMS Prince of Wales (2nd ship) is already going to be built with a catapult and arrestor gear, there is currently a feasibility study into the impact in terms of cost and delay of making HMS Queen Elizabeth the same.
Originally posted by waynos
It was a very small news item hidden away in last weeks Flight International, given the potential impact I would have thought it would have received more prominence, The first carrier has been signed off with a ski jump and the RN's idea is to have both ships equipped with both systems to enable exchange ops with other NATO and allied navies. If the F-35C is selected however the RN will need a cat launch capability straight away, my fear is that this alone will be used as an excuse to 'fall back' on the F-35B.