It looks like you're using an Ad Blocker.
Please white-list or disable AboveTopSecret.com in your ad-blocking tool.
Thank you.
Some features of ATS will be disabled while you continue to use an ad-blocker.
originally posted by: anonentity
a reply to: pteridine
I would say if the Three gorges Dam actually fails , so does the CCP, it was only passed with a two thirds vote in the assembly. The most vociferous opponent was disappeared after he predicted everything that happened so far except the actual failure.
originally posted by: anonentity
a reply to: MissSmartypants,
Past rains have caused the flood plain. Its all built on flood plain. Very difficult to do drayage except back into the river.